HWY 41 Project

Um, wow. I had heard it was a big project but wow. A guy at work said something about getting the fill from an area outside of Suamico to use for fill and turning left over hole into a wetlands

Village of Howard

Zach571
__________________

Reply With Quote
Old 10-04-2010, 07:37 PM  
Junior Member
 
Jesse-James's Avatar

Caledonia, WI
Join Date: Oct 2010
Posts: 10 | Kudos: +11
As if we don't have enough orange barrels on the highways yet.
__________________

Reply With Quote
Old 10-05-2010, 01:46 PM  
Junior Member

madison, wi
Join Date: Oct 2010
Posts: 6 | Kudos: +10
Sounds like something you'd need a winch to get through...
Reply With Quote
Old 10-06-2010, 01:13 PM  
Junior Member

Waterford, WI
Join Date: Sep 2010
Posts: 5 | Kudos: +10
they should just rip all the roads out.
Reply With Quote
Old 10-08-2010, 06:55 AM  
Junior Member

Madison, Wisconsin
Join Date: Oct 2010
Posts: 8 | Kudos: +10
I drive between Madison and Appleton about two to three times a week, and the construction project between Fond du Lac and Green Bay is a multi-year project. They are widening HWY 41 to 3 lanes that whole stretch. It is a pain and will be til about 2012 I believe. Lots of fill on the Butte mor Bridge too. I believe the WIDOT has some 3d pics and info on the whole project on their website.
Reply With Quote
Old 10-08-2010, 12:07 PM  
Junior Member

Milwaukee, Wisconsin
Join Date: Oct 2010
Posts: 12 | Kudos: +10
It's bad enough with 894 being all torn up and every bridge being torn down and redone as well as the on/off ramps. At least they replaced the zoo interchange bridge since that one was all cracked. Now if they could do something about the bottleneck that happens at the 43/894 merging area.
Reply With Quote
Old 11-16-2010, 06:45 PM  
Junior Member

Menomonee Falls, WI
Join Date: Nov 2010
Posts: 7 | Kudos: +10
There are only two seasons in WI anyway...Winter and Road Construction!
Reply With Quote
Old 11-16-2010, 10:19 PM  
Junior Member

Oshkosh, WI
Join Date: Nov 2010
Posts: 4 | Kudos: +10
Well Fond Du Lac has cleared up a lot, they moved all those barrels north to the Butte Des Mortes bridge on now. Oh Well, if it helps move things along in the long run, I'm all for it. Plus this summer in Oshkosh, I think every single road was under construction so I might just be used to it now
Reply With Quote
Old 11-17-2010, 07:47 AM  
Member

appleton, wi
Join Date: Oct 2010
Posts: 49 | Kudos: +10
I drive 41 almost every day. cant wait untill its done.
Reply With Quote
Old 11-17-2010, 12:10 PM  
Junior Member

Sault Ste Marie, Michigan
Join Date: Nov 2010
Posts: 24 | Kudos: +12
Yeah, 41 really is a mess. It's nice when traveling from the north though. The extension of 41 up towards Crivitz cut off half an hour for a trip from my house to Green Bay.
__________________

Reply With Quote
Reply

Go Back   CityProfile.com Forum - Local City and State Discussion Forums > United States City Forums > Wisconsin
Bookmark this Page!

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes


Suggested Threads

Powered by vBadvanced CMPS v3.2.3

Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.